Emergency Lighting UPS Installation


Client:

Lion Plaza is a commercial building that lies in the heart of the City of London and is managed by Integral.


ups installation

The Project:

During one of our routine service inspections our UPS Engineer found that the inverter on their emergency lighting system had failed and due to the age of the unit spare parts were now obsolete. Our solution was to install a completely new maintained system which will supply to a maximum of 1000W for 3 hours.

We continue to provide after sales support as well as Uninterruptible Power Supplies maintenance and repair to this valued client.

The project was delivered on time and on budget.

Equipment Used:

BCP 1kVA PowerPro ELXA 1.2kVA Maintained Static Inverter system with 180 minutes (at full load). 1 phase input/1 phase output to 220/230/240vAC

The Tasks & Services:

· Project Management

· Equipment Provision

· System Design

· Electrical Installation

· Specialist Delivery & Positioning of Equipment

· User Training

· Testing & Commissioning

· Service & Maintenance